Click on the slide!

Baars Split Hopper Barges

Seagoing transport of split hopper barges 335 m3

Click on the slide!

Baars Split Hopper Barges and Hopper Barges

Split- and hopper barges at nature project Sophiapolder - NL

Click on the slide!

Baars Split Hopper Barges

Split hopper barges working on the Thames at London - UK

Click on the slide!

Baars Split Hopper Barges

Split hopper barges 335m3 directly delivered form yard for project at the Donau - AT

Click on the slide!

Baars Split Hopper Barges

Transport split hopper barge 700 m3 project Zeebrugge - BE

Click on the slide!

Baars New Split Hopper Barges

New building of split hopper barges 335m3, put into the water with 2 cranes

Click on the slide!

Baars Modular Pontoons

Pontoon exists out of Confloat Containers for project of Martens en Van Oord

Click on the slide!

Baars Pontoons and Split Hopper Barges

Confloat pontoons at London Gateway - UK

Click on the slide!

Baars Modular Pontoons

Jackup pontoon working in Dubai for BAM international

Click on the slide!

Baars Split Hopper Barges

Loading of split hopper barge at nature project Sophiapolder - NL

Pontoons and Push Boat at Concordia Lake

Since February 2011 Fugro is using 3 working platforms of 24 by 12 metres on the Concordia Lake in Saxony-Anhalt (Germany) composed of couple pontoons of Baars BV. From the platforms drilling is carried out in the bottom of the Lake. By comparing the drilling samples with those from previous years people are trying to find out if there have been any movements in the soil and if so in what directions. A major shift of soil material would be a cause of a bank subsidence such as this took place in 2009, which took 3 lives and a number of homes that disappearedin the Lake.