Newsarchive
The Sophiapolder will be turned into a nature island, as a result of which a special oasis of peace and quiet will be created with a spacious freshwater tidal region with reed-land and reed brushwood in the middle of the activities of the Drechtsteden. Contractor Gebr. Van de Lee has selected split hopper barges from [...]
> Lees meer
After the summer, two new split hopper barges B301 and B304 from Hungary are put into service. The barges are put into service on the Danube near Vienna.
> Lees meer
The Londen Gateway Port project consists of the construction of a new terminal for the globally operating company DP World from Dubai (well-known because of the Second Maasvlakte). DP World is going to invest 2.2. billion Euros into the project and the dredging activities will be executed by Dredging International. Baars Confloat will deliver a [...]
> Lees meer
Since February 2011 Fugro is using 3 working platforms of 24 by 12 metres on the Concordia Lake in Saxony-Anhalt (Germany) composed of couple pontoons of Baars BV. From the platforms drilling is carried out in the bottom of the Lake. By comparing the drilling samples with those from previous years people are trying to [...]
> Lees meer
At this moment, our fleet consists of 47 barges (14 drywell hopper barges, 8 hopper barges and 25 split hopper barges). The fleet is extended with two split hopper barges of 850 m3 which will be delivered in the second quarter of 2012. This summer, the four new 335 m3 split hopper barges B301 up [...]
> Lees meer